Licence RBQ 5718-1380-01 · Montreal · Laval · North Shore · Laurentians

Projects

Public, institutional and residential projects delivered with respect for standards, schedules and occupants.

Fire station stairwell: damaged plaster areas encapsulated on the walls, along the piping

Fire station

Encapsulation of asbestos-containing plaster
Interior corridor with a trench opened in the concrete slab along the wall, concrete debris and soil removed

Saint-Eustache

Trench cut in a concrete slab
House attic after vermiculite removal: joists and wood boards cleared, chimney and piping

Blainville

Asbestos-containing vermiculite removal from an attic
Brick facade of a Plateau building in winter, top of the wall opened under the roof, scissor lift in front of the storefront

Plateau-Mont-Royal

Fascia and 2 feet of brick removal
House kitchen and dining area with a textured ceiling, before the work

Laval

Ceiling strip-out under asbestos conditions
Room stripped down to the concrete slab, ceiling opened and electrical wiring left in place

Cartierville cultural and community centre

Strip-out of 2 rooms
House attic protected with Ram Board, HEPA air scrubber set up in the work area

Laval

Ceiling strip-out under asbestos conditions
Space stripped down to the brick walls and insulation, ceiling opened to the structure, rolling scaffold on site

Saint-Hubert project

Complete strip-out, non-contaminated
Sealed mechanical room for decontamination

Concordia University

Decontamination and cleaning under asbestos conditions
Two-storey school with its exterior brick cladding being removed, fenced work area at ground level

École René-Guénette

Exterior brick removal
Stripped building with a protective enclosure at ground level

Habitations Barclay

Foundation parging removal under asbestos conditions
Stairwell fully sealed in polyethylene for high-risk asbestos work

École René-Guénette

Mobilization for high-risk asbestos work
Interior stripped down to the structure

King-Edward

Interior strip-out under asbestos conditions
Basement with stone walls, ceiling stripped down to the joists after removal

Pincourt

Ceiling strip-out under asbestos conditions
Large space fully stripped: concrete slab, exposed ducts and sprinklers

5100 de Maisonneuve

Complete interior strip-out
Sealed work area: textured ceiling opened to the joists, HEPA air scrubber and scaffolding

École René-Guénette

Trench under asbestos conditions
Interior steel structure to be demolished in a high-ceilinged commercial space

900 Beaulac Street

Steel structure demolition
Gymnasium with one full wall sealed in polyethylene and an access door to the work area

Piscine communautaire Notre-Dame-de-Grâce

Gymnasium mobilization for asbestos decontamination
Room sealed in polyethylene, ceiling opened to the joists and block wall exposed

Hartland-Outremont

Openings under asbestos conditions for construction work

Let's talk about your project.

Request a quote(514) 561-5476Send your plans or photos — reply within 24 h.
CallQuote