Licence RBQ 5718-1380-01 · Montreal · Laval · North Shore

Work following a CNESST stop-work order

Is your site shut down because of a contaminant? We do the corrective work and handle the paperwork, so you can apply to resume.

We know shut-down sites

When a CNESST inspector stops a site because of asbestos or another contaminant, every lost day is expensive. We are used to these files: managing a shut-down site, the documents to produce and the steps to clear before work resumes. You do not have to learn the process while living through it.

How we get you out of it

  1. 01

    Review of the inspector’s notice and a site visit, to know exactly what is required.

  2. 02

    Paperwork handled: work procedures and documents to submit.

  3. 03

    Corrective work: containment, decontamination, HEPA clean-up and final air test.

  4. 04

    A complete record of the work done, to support your request to resume the project.

How we work

  1. 01Site visit and samplingWe assess the site and identify hazardous materials.
  2. 02Quote within 24 hA precise scope, a clear price, a realistic schedule.
  3. 03Containment and workSealed area, negative pressure and code-compliant procedures.
  4. 04Air test and handoverHEPA cleaning, final check, space ready for what comes next.

Frequently asked questions

How soon can my site resume?

It depends on the corrective measures required and on the inspector’s decision. We provide a quote within 24 h and can mobilize a crew quickly, 7 days a week.

Who decides when work can resume?

The CNESST. Our role is to carry out the corrective work and provide the documents that support your request to resume.

Do you handle the paperwork?

Yes. We are used to the paperwork and to managing a site shut down by the CNESST: work procedures, documents to produce and file follow-up.

My site was shut down for a contaminant other than asbestos. Can you help?

Yes. We also handle lead, mold and vermiculite.

Can I keep working elsewhere on the site?

It depends on the scope of the order set by the inspector: it may cover one area, one task or the whole site. We help you understand exactly what is covered.

Learn more

Official sources our methods and this page rely on.

Sealed mechanical room for decontamination
Completed project

Decontamination and cleaning under asbestos conditions – Concordia University

View project →

Let's talk about your project.

Request a quote(514) 561-5476Send your plans or photos — reply within 24 h.
CallQuote