Why test before the work starts
In Quebec, before renovating or demolishing, the law requires knowing whether the affected materials contain asbestos. Until a suspect material has been tested, it is presumed to contain asbestos and must be handled as such. Testing ahead of time means the right method, the real cost and no work stoppages.
- Asbestos: plaster, tiles, ceilings, insulation
- Vermiculite
- Lead paint
- Mold (when needed)
A precise quote within 24 h
Send your plans or photos — reply within 24 h.
How it works
- 01
Site visit and division of the building into zones: the same material, installed the same way, at the same time.
- 02
A hygienist takes small pieces of each material without contaminating the space.
- 03
An external, independent, accredited laboratory analyzes the samples. A material counts as asbestos-containing from 0.1%.
- 04
Report by zone and, if needed, a precisely priced removal quote.
How many samples?
It depends on the material. A single positive result means the whole zone is considered asbestos-containing; if all are negative, the zone is declared free of asbestos.
- Plaster and site-mixed materials
- 9per zone, spread evenly across the zone
- Pipe insulation
- 3 minimumper type of insulation, plus 1 per elbow, fitting or repair
- Sprayed insulation (fireproofing)
- 2per zone